one woman in a hard hat and one woman with laptop walking through factory floor conducting an energy analysis

Engineering services

North Shore Gas Energy Efficiency Program

Our engineering services offer comprehensive solutions tailored to meet your specific needs to help you optimize your systems energy-saving potential.

Gas optimization study (GOS)

Third-party engineering study providers complete a multiday energy survey and analysis at your facility. The study is similar to an ASHRAE Level 2 Audit focusing on low-cost and no-cost measures as well as capital improvements with payback of 18 months or less.

Engineering study

Third-party engineering study providers do an in-depth analysis on one process or project, not a comprehensive facility review such as GOS. This can consist of a report, biddable drawings or feasibility study of identified measure.

Application form

To get started, contact us or call 855-849-8928.


Eligibility

This offering is available to you if you:

  • Use at least 500,000 therms annually for steam plants and/or process heating
  • Have buildings 75,000 square feet or larger seeking to optimize central heating plants and/or air handling systems equipped with building automation systems (direct digital controls systems preferred)